Planning a Tile Project, Step by Step

Most tile projects go sideways for the same reasons: the scope was never written down, the prep was underestimated, or two estimates were compared as if they described the same work. This is the order that avoids all three.

Tile installer checking spacing while setting large-format porcelain tile

1. Decide what the project actually is

  • Write down the rooms and surfaces involved. "Bathroom" can mean a floor, or a floor plus a shower plus a vanity backsplash, and the difference is most of the budget.
  • Separate what you need from what you want. A failing shower is a need; a herringbone pattern is a want with a labor cost attached.
  • Note anything you already know is wrong — a soft spot, a stain on the ceiling below, a slab crack, tile that keeps coming loose.

2. Measure roughly and take photos

  • Length times width per room is enough for a first conversation. Nobody expects a homeowner to produce a takeoff.
  • Photograph the whole room from a corner, then the details: thresholds, transitions, the shower valve, the area around the toilet, any damage.
  • If there is existing tile you might want matched, photograph the back of a spare piece — the markings help identify it.

3. Choose material before you finalize a budget

  • Format matters as much as price per foot. Large tile changes the prep required; mosaic changes the labor.
  • Confirm the tile is rated for where it is going: floor versus wall, interior versus exterior, and slip resistance in wet areas.
  • Read the ceramic versus porcelain comparison if you are undecided.
  • Order overage for cuts and waste, and keep leftovers for future repairs.

4. Understand the prep your space needs

  • Ask what is under the current surface and what condition it is in. This is where estimates diverge.
  • In wet areas, ask which waterproofing system will be used. Tile and grout are not waterproofing.
  • On slabs, ask how flatness and cracking were evaluated — particularly with large-format tile.

5. Collect written estimates and compare scope

  • Compare line by line, not total to total. The cheapest quote is often the narrowest one.
  • Confirm demolition, disposal, prep, trim, fixture reset and cleanup are addressed one way or the other.
  • Ask how unexpected conditions are priced and approved once demolition begins.

6. Plan for the disruption

  • Tile removal is dusty and loud. Ask about containment and where materials will be staged.
  • Single-bathroom households should confirm how many days the shower will be unusable.
  • There are waiting periods built into the work — before foot traffic, before grouting, before use. They are not delays.